Client

Ugo & Sons Co.

Location

Lagos State Nigeria.

Deliverables

electric pump installation

Year

2023

electric pump installation

This project was successfully completed adopting several techniques. Some of which are:

  • Preparation: Reviewing the pump manual, Gathering the tools and materials, Choose the installation location, Preparing the foundation (if needed)
  • Pump and Piping Installation: Connecting the pump inlet and outlet to the piping system, Installing check valves, Priming the pump, etc.
  • Electrical Connection: : Disconnecting the power, Connecting the cables, Testing the electrical connection, etc.

Other Projects

Pressure Test & Leakage Detection

Pressure & Leakages / 2018 / Lagos

More details

Flow Meter Calibration

Calibration / 2020 / Abuja

More details

Electric Pump Installation

Electrical Pump / 2023 / Lagos

More details

... a new face in oil and gas

Call Now Button